Request a Quote


Delhi NCR

Mandatory 50 mg/Nm³ Compliance for Boilers & Furnaces in Delhi NCR

Install new APCD systems as per CAQM Direction No. 98. Industries operating solid fuel boilers and dust-generating furnaces must assess compliance with the revised PM emission requirements now in effect for the covered categories.

Discuss your pollution-control application

Understanding the 50 mg/Nm³ Emission Norm

As per CAQM Direction No. 98, industries covered by Clause 21(i) must comply with the applicable maximum particulate matter (PM) emission limit of 50 mg/Nm³.

Key regulatory requirements:

  • Mandatory installation of Air Pollution Control Devices (APCDs)
  • Applicable to boilers, thermic fluid heaters, and industrial furnaces
  • Target industries include Red Category (Medium & Large) units
  • Compliance deadlines:
    • Covered Clause 21(i) industries: 1 October 2026 (effective after amendment)
    • Implementation date after amendment: 1 October 2026

Industrial units unable to meet the revised emission norms may face operational restrictions or penalties.

Official amendment: the revised standard applies from 1 October 2026 to the covered Clause 21(i) industries. Reference checked: 30 October 2026.

Industries Covered Under the Directive

As per CAQM Direction No. 98, the revised emission norms apply to specific categories of industries operating boilers and furnaces generating particulate emissions.

Check each installation against the notified scope; the process sectors discussed below include:

Red Category (Medium & Large) Industries

Industries classified under the CPCB Red Category with significant particulate emissions from industrial operations, particularly those involving solid fuel combustion and dust-generating processes.

Food & Food Processing Units with Boilers

Units operating coal or biomass-fired boilers for steam generation, where flue gas emissions require effective particulate control.

Textile Industries with Boilers / Thermic Fluid Heaters

Textile processing units using boilers or thermic fluid heaters, especially where solid fuels are used and particulate emissions are generated.

Metal Industries Operating Furnaces

Industries using industrial furnaces for heating, melting, or processing metals, where dust and particulate emissions are generated during operation.

Immediate action is required if your plant:

  • Operates solid fuel-based boilers or furnaces
  • Has visible stack emissions or high particulate discharge
  • Is unable to meet the 50 mg/Nm³ emission standard
  • Has received or is expecting a pollution control notice from authorities

Key Consideration:

If your process involves combustion or material handling generating particulate matter, installation of a properly engineered APCD system is essential to achieve compliance.

Recommended APCD Solutions for 50 mg/Nm³ Compliance

To achieve the mandated 50 mg/Nm³ particulate emission standard, industries are required to install properly engineered Air Pollution Control Devices (APCDs) based on process conditions, fuel type, and dust characteristics.

TECHFLOW provides engineered APCD solutions for boiler and furnace emission control, including:

Bag Filter Systems (Baghouse)

Designed for high-efficiency particulate removal in:

  • Boiler flue gas filtration (coal / biomass-fired systems)
  • Furnace dust collection
  • High dust load industrial processes

Key capabilities:

  • High collection efficiency for fine particulate matter
  • Consistent performance under variable load conditions
  • Suitable for continuous industrial operation

Electrostatic Precipitators (ESP)

Applicable for large gas volumes and specific process requirements in:

Key capabilities:

  • Gas-flow capacity selected and specified for each process duty
  • Low pressure drop operation
  • Proven performance in process industries

Application-Based System Selection

Selection of APCD is based on:

  • Process type (boiler / furnace)
  • Dust load and particle characteristics
  • Flue gas temperature and composition

 

Replace Inefficient Systems with Engineered APCD Solutions

Many existing systems are not capable of meeting revised norms.

Instead of temporary fixes, compliance requires:

  • Installation of new-generation Bag Filter systems
  • Replacement of outdated or undersized dust collectors
  • Proper system design based on process conditions

Benefits of replacement approach:

  • Designed for the specified emission requirement under agreed operating conditions
  • Improved operational reliability
  • Optimized airflow and pressure drop
  • Long-term performance stability

NPC Empanelled OEM for APCD Solutions in Delhi NCR

TECHFLOW is among the select Original Equipment Manufacturers (OEMs) empanelled by the National Productivity Council (NPC) for installation of Air Pollution Control Devices (APCDs) in Delhi NCR industries.

As per the official public notice, empanelment is granted only after evaluation committee approval and field verification of capabilities and installations, ensuring that only technically qualified and proven OEMs are approved.

 

CPCB NPC - Techflow OEM Empanelment for APCD

 

CPCB NPC - Techflow OEM Empanelment for APCD

 

Recognized & Verified Capability

  • Empanelled for:
    • Pulse Jet Bag Filter (Baghouse) systems
    • Dry Electrostatic Precipitators (ESP)
  • Inclusion in NPC list confirms:
    • Technical competence
    • Execution capability
    • Verified industry experience

Proven Experience Backed by Legacy

  • Engineering experience since 1979 in industrial air pollution control
  • Extensive application knowledge across:
    • Boilers
    • Furnaces
    • High dust load processes

Large-Scale Manufacturing Strength

  • One of the APCD manufacturing facilities in India
  • Spread across 31,700 sq. meters
  • Capability to handle large and complex industrial projects 

Engineering-Led Approach

  • System design based on:
    • Process parameters
    • Dust characteristics
    • Compliance requirements
  • Focus on performance, reliability, and long-term operation

Global Reach & Industrial Footprint

  • Experience serving diverse industries across domestic and international markets
  • Solutions designed for varied operating conditions and regulatory environments

End-to-End Execution Capability

  • Design → Manufacturing → Supply → Installation → Commissioning
  • Structured approach to ensure timely compliance with regulatory deadlines

APCD Installation Across Delhi NCR for 50 mg/Nm³ Compliance

TECHFLOW provides APCD (Bag Filter & ESP) installation solutions for industries across the Delhi NCR region, supporting compliance with CPCB and CAQM emission norms.

For Delhi NCR project enquiries, provide the site location and process details. Enquiry locations may include:

Delhi (NCT) – Industrial Zones

Project enquiry locations:

  • Bawana Industrial Area
  • Narela Industrial Area
  • Okhla Industrial Area
  • Mayapuri Industrial Area
  • Wazirpur Industrial Area

Supporting boiler and furnace emission compliance across all Delhi industrial zones

Haryana – Key Industrial Districts

Bag Filter and ESP systems for industries in:

  • Faridabad
  • Gurugram
  • Nuh
  • Rohtak
  • Sonipat
  • Rewari
  • Jhajjar
  • Panipat
  • Palwal
  • Bhiwani
  • Charkhi Dadri
  • Mahendragarh
  • Jind
  • Karnal

For regional coordination, contact TECHFLOW through the Representative Network. Installation references are confirmed per enquiry.

Uttar Pradesh – NCR Industrial Belt

APCD installation across:

  • Ghaziabad
  • Noida
  • Greater Noida
  • Meerut
  • Bulandshahr
  • Baghpat
  • Hapur
  • Shamli
  • Muzaffarnagar
  • Focused on high-density industrial clusters with compliance requirements

     

Rajasthan – NCR Adjoining Regions

Serving industries in:

  • Alwar
  • Bharatpur
  •  Supporting industries falling under Delhi NCR regulatory jurisdiction

     

Localized Engineering & Execution

  • Site-specific system design based on plant conditions
  • Response and site-support arrangements agreed for each project
  • Experience working with industries under Delhi NCR pollution control regulations

 

 

For Delhi NCR project coordination, contact delhi@techflow.net. See the TECHFLOW Representative Network for contact details. Scope and response arrangements are confirmed per project.